Kinet modular
Factory Direct · B2B Only

Zero-Carbon Smart
Modular Homes
for Global Projects

Hot-dip galvanized light steel modules — 90% prefabricated, delivered in 15–25 days. Typhoon Level 17 · Seismic 9+ · 92% usable area rate.

90%
Prefabricated
15d
Avg Delivery
$1.8k
Per m² From
Cat 17
Wind Rated
ASTM A123ISO 9227EN 15978CEAS/NZSHEPA H13

Why Leading Developers Choose Kinet

Structure-Energy-Intelligence integrated. Industrialized, standardized, intelligent spatial modules for ultra-low energy and extreme climates.

01

Rapid Deployment

90% factory prefab + dry construction. Small units in 7 days, large projects in 20 days. Zero weather delays.

02

Extreme Climate Ready

Wind Level 17 (61m/s). Seismic Magnitude 9+. Proven in Saudi 50°C delta and Philippine typhoons.

03

40% Cost Reduction

$1,800–2,300/m² vs $2,500–3,400 traditional. Foundation costs cut 40%. Upgrade costs 30–50% lower.

04

Zero-Carbon Future

12.8 tons CO₂ reduction per unit (EN 15978). 100% recyclability. Heating energy −30–40%.

05

Durable & Corrosion-Free

85μm zinc coating (ASTM A123). Salt spray >5,000 hrs (ISO 9227). 30+ year lifespan.

06

Fully Customizable

430 ft² studio to 2,756 ft² villa. 17 certified templates. 1-to-1 custom per your drawings.

Engineering Metrics That Matter

Verified physical performance from factory testing and global deployments.

92%
Usable Area Rate

vs 75% traditional concrete

9+
Seismic Rating

Inter-story drift ≤1/50

0.032W/(m·K)
Thermal Insulation

Equivalent to 370mm brick wall

40dB
Indoor Sound

At 60dB outdoor noise

Five Integrated Building Systems

Column-free design delivers 10–15% more usable area. Every system engineered for global certification.

Wall System

  • 120–200mm composite panels
  • Column-free · +10–15% usable area

Roof System

  • Triangular/T steel truss
  • Wind resistance Level 17 (61m/s)

Floor System

  • Galvanized steel joists
  • Moisture-proof treated panels

Structure

  • Zinc coating ≥85μm (ASTM A123)
  • Salt spray >5,000 hours

Foundation

  • 1/5 weight of traditional
  • Strip foundation compatible

Standard Models & Custom Solutions

From compact worker housing to luxury resort clusters. All factory-prefabricated with pre-installed MEP.

Studio Unit (1BR+LR+Bath)Popular

Studio Unit (1BR+LR+Bath)

40 m²1 Floors7 days

430 ft² GFA · 3.0m ceiling · cultured stone + cement fiber exterior. Minimalist door, double-glazed aluminum windows.

From
$1,800/m²
Two Bedroom Family HomeBest Seller

Two Bedroom Family Home

80 m²1–2 Floors12 days

860 ft² GFA · 1–2 floors · ideal for subdivisions and family developments.

From
$1,900/m²
Luxury Villa (5BR+3LR)Premium

Luxury Villa (5BR+3LR)

256 m²2 Floors20 days

2,756 ft² GFA · 2 floors · bronze European door · floor-to-ceiling glass options.

From
$2,200/m²
Resort / Hotel ClusterCommercial

Resort / Hotel Cluster

CustomMulti FloorsScalable

Modular hotel blocks, glamping suites, mining camps. Cluster configuration for fast ROI.

From
$1,850/m²
OEM / ODM Custom BuildCustom

OEM / ODM Custom Build

CustomAny FloorsTBD

1-to-1 per your drawings. Factory MEP. Global supply chain & after-sales.

From
Contactfor quote

Light Steel vs. Traditional Structures

Hard numbers across prefab rate, cost, lifespan, waste, and extreme weather performance.

MetricLight Steel (Kinet)ConcreteTimber
Prefab Rate90%30%60%
Construction Time15–25 days45–60 days25–35 days
Total Cost / m²$1,800–2,300$2,500–3,400$2,600–3,200
Lifespan30+ years30–50 years10–20 years
Construction Waste~50 kg/unit2–3 tons200–300 kg
Typhoon ResistanceLevel 17Level 10–12Level 6–8

End-to-End Developer Partnership

Design / Build / Marketing integrated. Technical consulting → EPC → Joint development.

OEM / ODM

Manufacture under your brand with full customization.

EPC Turnkey

End-to-end delivery from design to installation.

Joint Development

Co-invest in regional modular clusters.

Exclusive Distribution

Regional rights with training and support.

01

Planning & Design

17 certified template libraries as starting point.

02

Site Survey

Geology & climate-adapted engineering package.

03

Model House

45-day rapid validation before scale-up.

04

Cluster Development

Regional scaled replication.

Full Factory Prefabrication (2D Modules)

Structure customized 1-to-1 per client drawings. MEP pre-installed. Error-free on-site assembly.

CNC Precision

Tolerance within 1mm. 24/7 robotic framing.

MEP Pre-Install

Electrical & plumbing factory-embedded.

Global Supply Chain

Multi-country after-sales network.

Full Factory Prefabrication (2D Modules)

Carbon Reduction Closed Loop

Construction pollution at 1/5 of traditional. 40% operational energy savings.

1/5
Construction Pollution
40%
Energy Savings
100%
Material Recyclability
12.8t
CO₂ Reduction / Unit

3D Studio & Smart Quote Engine

Interactive configurators launching with our admin platform. Register interest to get early access.

Coming Soon

3D Configurator

Visualize models, materials, and dimensions. Syncs to pricing when live.

Request Demo
Beta · Admin Only

Smart Quote Engine

Instant CFR estimates with shipping, duties, and volume discounts.

Get Manual Quote

Start Your Project

Tell us about your project scale, destination port, and timeline. Our B2B team responds within 24 hours.